EZ-UP

 

Patent
Pending

Drywall Ceiling Installation System

For more information, or to place an order for your EZ-UP Celing Drywall Installation System complete with two (2) EZ-UP Lead Blocks, four (4) EZ-UP Follow-Up Blocks and detailed instructions  please click HERE.


Installing Ceiling Drywall?
See how
EZ It Can Be!

 

Secure a short length of 2"x4" to the top of the wall studs as show at left leaving enough space between the top edge of the cleet and the bottom surface of the overhead floor joists to allow your specific thickness of drywall to fit into place...

 

Measure the distance from the wall based on your sheetrock dimension and secure both EZ-UP Lead Blocks perpendicular (as shown at right) to different floor joists so that, when turned, the lip on the Lead Block will support the sheetrock...

(Remember to skip at least two joists between Lead Blocks to ensure maximum support.)

 
 

Lift the wall edge of the sheetrock into the lip of the cleat then lift the sheetrock to the floor joists and twist the EZ-UP Lead Block so the lip of the block supports the room side edge of the drywall sheet...

 

This is how each of the two EZ-UP Lead Blocks will look when in the support position...

 
 

With the first sheet of drywall held safely in place with the EZ-UP System, you now have both hands free to secure it to the floor joists.

 

To install additional sheets of drywall adjacent to the first sheet, remove the Lead-Blocks and then screw the EZ-UP Follow-Up Blocks to the same  joists but on the room-side edge of the first sheet of drywall...

 
 

Then twist the EZ-UP Follow-Up Block into place as shown to support the drywall already in place and provide the lip for the next sheet of drywall...

 

Reinstall the EZ-UP Lead Blocks on the same joists measuring out the appropriate distance for your drywall dimension and repeat the process until your entire ceiling is complete!

(Don't forget to mark where the joists are located with a chalk line or pencil in order to make securing the drywall faster and easier!)

Below are images showing the proper installation of ceiling drywall using the EZ-UP System...

The images above and below show the drywall after two sheets have been installed using the EZ-UP System. Note how the EZ-UP Follow-Up Blocks take the place of the EZ-UP Lead Blocks as the installation moves across the ceiling.

NOTE: Additional EZ-UP Ceiling Drywall Installation Systems can be purchased allowing several sheets of drywall to be installed at once before stopping to secure each section of sheetrock.

 

ORDER YOUR
EZ-UP
SYSTEM
TODAY!

For more information, or to place an order for your EZ-UP Celing Drywall Installation System complete with two (2) EZ-UP Lead Blocks, four (4) EZ-UP Follow-Up Blocks and detailed instructions  please click HERE.


Copyright © 2006 JSM & Associates, LLC. All rights reserved.